SETSCO delivers On-Site Testing & Investigation Services, providing real-time inspection, analysis, and troubleshooting directly at your project site. SETSCO offers comprehensive solution to help asset owners meets EMC compliance and solve technical challenges in real operating environment which is critical for system reliability.

Advantages of SETSCO’s On-Site Services

Reduced downtime & costs

Immediate, actionable results

Stronger safety & regulatory compliance

Greater operational control

No disruption to operation

If you are planning new deployments, managing technical issues, or preparing for audits, our on-site expertise ensures assurance where performance matters most.

Industries We Serve

manufacturing & industrial

data centres & ict

transportation & automative

power & utilities

healthcare & labs

Scope of Services

EMC and EMI testing and Investigation

EMC and EMI testing and Investigation

– Radiated Emission Testing and Measurement

– Conducted Emission Testing and Measurement 

– Immunity testing (ESD, surge, EFT, radiated immunity)

– ESD Walking Voltage Measurement

– IEC & CISPR compliance evaluation

– Root‑cause investigation in real‑world conditions

– EMF measurement

– EMC Risk Analysis and Control Plan

– Onsite Inspection to Audit Installation Compliance

Electrical Testing and Commissioning

Electrical Testing and Commissioning

– Insulation resistance and earth continuity testing

– Functional testing

– Validation of installation in accordance to intended design and use

– Professional Engineer support

Vibration and noise measurement (On-site)

Vibration and noise measurement (On-site)

– Predictive Maintenance & Condition Monitoring: Periodic or continuous vibration survey to detect abnormalities or condition-based monitoring programs tailored to data center reliability needs.

– Vertical and Horizontal Vibration (Acceleration) Measurement

– Site Monitoring: Monitoring vibrations from external sources that may affect sensitive equipment from likes of Data Centres, Laboratories and Healthcare facilities, etc.

– Baseline/Acceptance Testing: Measuring vibrations during commissioning of new equipment to establish performance baselines.

Lightning Protection and Grounding Verification and Inspection

Lightning Protection and Grounding Verification and Inspection

– Technical documents review for conformity to applicable standard (e.g. SS 555)

– Review of existing lightning protection system (LPS) maintenance and inspection reports

– Site inspections for in accordance to “as built” and applicable standards

– Maintenance inspection and testing (e.g. air terminals, down-conductor, bonding, grounding & SPD)

– Continuity tests on parts of LPS and earth-termination system

– Review of risk assessment plan and inspection

Power quality monitoring and measurement

Power quality monitoring and measurement

– Comprehensive Site Surveys: Utilizing analyzers and sensors to monitor power quality over time for identifying issues

– Harmonic Analysis: Identifying and mitigating distortion caused by non-linear loads like VFDs, servers, and lighting.

– Voltage Variation Analysis: Recording and reporting on voltage variations to protect sensitive equipment

– Energy Efficiency Assessments: Evaluating power factor, peak demand, and energy consumption for optimal operations

Environmental and energy monitoring

Environmental and energy monitoring

– Illumination test
– Noise measurement
– Energy efficiency assessment
– Indoor air particle count and air particle concentration
– Room Positive Pressure measurement.
– Surface Resistance Measurement
– Vertical and Horizontal Vibration (Acceleration) Measurement

Forensic engineering, and failure analysis

Forensic engineering, and failure analysis

– Root cause investigation
– Material failure analysis
– Electrical and mechanical system failure investigation

QA/QC and Factory Acceptance Testing (FAT) support

QA/QC and Factory Acceptance Testing (FAT) support

– Witness testing – Independent third-party personnel monitor tests to ensure unbiased results and verify compliance with requirements.

– Factory Acceptance Testing (FAT): Conducted at the manufacturer’s facility before shipment to verify equipment design and performance, including documentation review, visual inspections, and functional tests.

– Site Acceptance Testing (SAT): Conducted on-site testing and inspection after installation to ensure equipment operates correctly in its intended environment, often covering integration with other systems.

– Customized Suppliers Readiness Audit: Customized audit protocol to provide unbiased assessment of suppliers’ capability, quality and readiness for the intended assignment

Contact us at electrical@setsco.com to discuss your project requirements.